NHT Engineering

Projects - Roroyere Hydro Electric Scheme

Roroyere Hydro Electric Scheme

Pictured Above: Roroyere Installation

Roroyere Installation Roroyere Installation Roroyere Installation Roroyere Installation

Click Thumbnails To Enlarge

Contract Description

NHT Engineering Ltd Designed, Manufactured, Factory Tested & delivered to site a Horizontal shaft twin jet Pelton Turbine with integral turbine shaft and twin bearing on turbine casing complete with shaft coupling with low pressure hydraulic actuators and gravity deflectors, also supplied a Ø500mm butterfly valve (MIV) with hydraulic actuation for opening & drop weight gravity closing complete with upstream and downstream head gauges calibrated from 0-20 bar.
this project was completed and delivered to site in July 2011

Related Products

  • Sorry, no projects at the minute