Small Scale Hydroelectricity at Garbhaig
This case study is based on extracts from a publication
by ETSU for the UK Government DTI in 1995.
Garbhaig Hydro Power Ltd. - BES Company formed 1986.
Site - within a National Scenic Area, adjoining Loch
Garbhaig
Slattadale Forest, south of Lake Maree, Rosshire, Scotland.)
Project originally begun, a pipeline laid, mid 1980's.
INPUT
Water source - natural water storage at Loch Garbhaig,
enhanced by 2m weir at loch mouth.
Supplied - through 1400 metres of buried pipeline,
continously welded steel, 660mm diameter.
Head -165 metres.
PLANT
ELECTRICAL and MECHANICAL TURNKEY PROJECT by NEWMILLS
HYDRO.
1000kW Newmills Hydro Pelton Turbine, driving a synchronous
generator of the same rating.
Feeding into the national power Grid via a 415V-to-33kV
transformer.
By December 1994 the project had been operating successfully
since commissioning, and had supplied 9GWh to the Grid.
OUTPUT
Generation of sufficient electricity to meet average
needs of 750 homes.
Further information is available from
NHT Engineering
EMMISSIONS SAVED ANNUALLY
2200 tonnes of carbon dioxide, 130 tonnes of sulphur
dioxide, 15 tonnes of nitrous oxide gases
when compared with the equivalent output from a fossil-fuelled
power station.
ENVIRONMENT
Highland Regional Planning Authorities, Scottish Natural
Heritage, the Forestry Commission, and the Highland River Purification
Board all involved in planning consultations - environmental considerations
were paramount.
Tree screening was used at the turbine house and transformer
yard, mounding was used to hide the access road.
Local stone was used for the intake structure and access
road.
FINANCE
An electricity purchase contract including a premium
for renewable energy, awarded in July 1991, enhanced financial
viability, and revitalised the original project.
Original construction work cost £555,000.
Further £600,000 invested 1992/93 - NEWMILLS
HYDRO becoming involved - feasibility studies, new machinery,
engineering management, reconstruction of the intake and pipeline,
installing new generating equipment, connection to the national
power Grid.
BES equity funds, bank loans, equipment funding from
an asset finance company - no grants or government loans.
LOCAL OPINION
Access to a site of natural beauty improved, without
disturbing the attractiveness of the area.
Fishing unnaffected - and the loch is more accessible
for fishermen.
Local opinion of the scheme is supportive.
"The experience at Garbhaig has provided valuable insight
into the protection of a natural area by utilising local materials
where possible, whilst developing a natural resource for public
benefit" -
D.T. McKenzie CA, Garbhaig Hydro Power Ltd..
Further information :-
New and Renewable Energy Enquiries Bureau, ETSU, Harwell, Oxfordshire
OX11 0RA, 01235 432450 (fax 433066)
Dougall Baillie Associates Consulting Engineers, 3 Glenfield
Road, Kelvin, East Kilbride, G75 ORA, 01355 266480 (fax221991)
D J T McKenzie, CA Garbhaig Hydro Power Co. Ltd., Unit 1, James
Keiller Buildings, 32-34 Mains Loan,
Dundee, DD4 7BT 01382 455565 (fax 455518)
The addresses above are all in the United Kingdom, for where
the International telephone code is 44.
WEBSITE MAP
HOME